01DefineRecord the opening schedule, dimensions, use, finish and installation boundaries.
02CoordinateAgree frame sections, glazing, hardware, interfaces and the acceptance checklist.
03PreparePlan material procurement, cutting, machining and assembly to the approved details.
04AssembleCheck frame geometry, corner connections, glazing support and hardware operation.
05InstallConfirm the substrate, anchoring, alignment, perimeter sealing and drainage path.
06Hand overRecord agreed checks, operating instructions, maintenance information and outstanding items.